PPRuNe Forums - View Single Post - Missed Approach - when to climb?
View Single Post
Old 22nd Sep 2017, 04:31
  #97 (permalink)  
Virtually There
 
Join Date: May 2007
Location: Australia
Posts: 190
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by oggers
PANSOPS Vol I
6.1.4 It is expected that the pilot will fly the missed approach procedure as published. If a missed approach is initiated before arriving at the missed approach point (MAPt), the pilot will normally proceed to the MAPt (or to the middle marker fix or specified DME distance for precision approach procedures) and then follow the missed approach procedure in order to remain within the protected airspace.
Note 1.— This does not preclude flying over the MAPt at an altitude/height greater than that required by the procedure.
The end.
I'm happy to leave it at that.
Virtually There is offline