PPRuNe Forums - View Single Post - New control cable inspections.
View Single Post
Old 15th Aug 2017, 03:09
  #70 (permalink)  
Band a Lot
 
Join Date: Nov 2015
Location: Dog House
Age: 49
Posts: 779
Likes: 0
Received 0 Likes on 0 Posts
What must be included in a final certification?
4.4 If certifications for completion of stages of maintenance are made in the documents kept by the person carrying out the maintenance as a record of the carrying out of the maintenance, a final certification must:

**Ok so this is keeping the worksheets for required time and doing a logbookentry!

(a) include a brief description of the type of maintenance carried out;and
* All primary flight cables replaced with new.

(b) be signed by the person making the certification; and
*sign your name.

(c) include the licence number, airworthiness authority number orcertificate of approval number of the person making the certification; and
* 123456

(d) set out the time in service of the aircraft since new; and
*523 TTIS

(e) if the person making the certification is an employee--state the nameof the person's employer and the employer's certificate of approval number,licence number or airworthiness authority number; and
*if applicable

(f) set out details of the approved maintenance data used to carry outthe maintenance; and
* Manufactures of aircraft data


(g) if an exemption from or variation to a requirement is in force under regulation 42ZSin relation to the aircraft--set out details of the exemption or variation; and
*if applicable

(h) if, in the course of carrying out the maintenance, the weight orbalance of the aircraft has been varied--include a record of the variation; and

* Not applicable

(j) if a special inspection was carried out--set out what was found as aresult of the inspection; and

* Not applicable
(k) if, in the course of carrying out the maintenance, an inspectionusing a non-destructive testing method was carried out--set out:

*Not applicable

(i) the non-destructive testing method used in carrying out the inspection;and
(ii) the procedure used in carrying out the inspection; and
(iii) what was found as a result of the inspection; and

(l) include a list of airworthiness directives complied with in thecourse of carrying out the maintenance and a statement setting out any defectsfound in complying with those directives; and
* Not applicable if a separate entry was made for AD/GEN/87 has been made forthe removal.

(m) if, in the course of carrying out the maintenance, an aircraft component:
*Not applicable

(i) that has had maintenance carried out on it; and
(ii) that was supplied to the person carrying out the maintenance byanother person;
was fitted--set out the number of the document that covered the supply of thecomponent in accordance with subregulation 42W(4); and

(n) if, in the course of carrying out the maintenance, a time-lifedaircraft component was fitted or replaced:
(i) identify the component and that includes (if applicable) the partnumber and serial number of the component; and

* If classed as a component and not a part** They are now lifed so a P/N willbe required - dont recall them having a S/N.

(ii) list the airworthiness directives that have been complied with inrelation to the component; and

*Not applicable
(iii) if the component was supplied to the person carrying out themaintenance by another person--set out the number of the document that coveredthe supply of the component in accordance with subregulation 42W(4); and
(iv) if the component has not been overhauled--set out the time inservice of, or the number of cycles completed by, the component since new; and
(v) if the component has been overhauled--set out the time in service of,or number of cycles completed by, the component since its most recent overhaul;and
(vi) if the component is an engine--set out the test performance figuresof the engine; and
(p) if, in the course of carrying out the maintenance, an aircraftmaterial:
(i) that has had maintenance carried out on it; and
(ii) that was supplied to the person by another person; and
(iii) that is not a fluid;
was used--set out the number of the document that covered the supply of thematerial in accordance with subregulation 42X(1); and

* a GRN number

(q) identify the documents kept by the person carrying out themaintenance as a record of the carrying out of the maintenance; and

* Often a job number

(s) include the date on which the certification was made.

*15/8/17
Band a Lot is offline