You say a HST repair IAW "A Document" I assume this is either the AMM or the SRM, you don't specify.
In my world if you have done a temporary repair IAW either of these "documents" then :
1. The period before the repair is to be made permenant will be laid down
2. The period of inspection to ensure continued airworthiness will be laid down.
You cannot snatch "After each flight" out of thin air when the inspection interval might be "each daily inspection" "each weekly inspection" etc.
This and the reference is what your QC wants in my opinion.
Your log entry should be along the lines of "Temporary repair to *** iaw SRM 27-##-### inspect each daily inspection. and a deferred defect raised to that effect.
But what do I know I am retired but worked on the other side of the planet.