PPRuNe Forums - View Single Post - Catering mass on multiple legs
View Single Post
Old 20th Jun 2017, 16:20
  #1 (permalink)  
coldnorth
 
Join Date: Aug 2016
Location: europe
Posts: 3
Likes: 0
Received 0 Likes on 0 Posts
Catering mass on multiple legs

Let's say a European 737 is scheduled for -four- sectors with catering uplift only on the first leg. A gradual reduction of the catering mass, and corresponding CG movement, will occur as the day progresses.

Is there a legal requirement to update the Dry Operating Mass with actual catering on every sector, or can standard (catering) configurations be used; even on multiple sectors?

I've looked through CAT.POL.MBA, but none the wiser.
coldnorth is offline