Originally Posted by
moutere101
?...Boeing have a production plan that will have slots available early in the production cycle. With the ME3 appearing to be spreading deliveries out this has to open up additional slots.
If we're talking about 77X here, I thought the time frame was nearer the mid 2020s, rather than early 20s? Is 2023/24 soon enough?
Qatar might not need all their aircraft slots soon....😈