PPRuNe Forums - View Single Post - BA delays at LHR - Computer issue
View Single Post
Old 2nd Jun 2017, 11:07
  #461 (permalink)  
Caribbean Boy
 
Join Date: Jan 2010
Location: London
Posts: 379
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Epsomdog
A contractor doing maintenance work at a BA data centre is said to have inadvertently switched off the power supply, knocking out the airline’s computer systems, according to a report in The Times.

Quoting a BA source, the newspaper said the power supply unit that prompted the IT failure was working perfectly but was accidentally shut down by a worker. An investigation into the power outage is likely to focus on human error rather than any equipment failure, it said.
If this article is correct, then several questions have to be answered.

One is why had there not been a freeze on such work on one of the busiest periods of the year.

Another is why would an apparently competent person with a key shut down the power supply, which presumably was the UPS.

Any when it happened, why didn't the backup data centre at nearby Cranebank take over? I hope that one UPS isn't used for both data centres.
Caribbean Boy is offline