Originally Posted by
LTNman
Bridge was built in two halves to allow the taxiway above to remain open. The taxiway in the photo below was the temporary taxiway.
Looking at the roof of the tunnel today shows that the roof was poured on what looks like panels of boarding as the uneven edges can still be seen.
Thank you very much LTNMan. It has been due to the kindness of strangers like yourself I am able to piece together the construction method as BAM Nuttall couldn't help me, LLA wouldn't help me and LBC would...for £75 ph! At times I have been
!