It's unlikely that work in progress 77.5m from runway centreline would interfere with ILS Cat I signals as the ILS protected area is much smaller for Cat I equipment when compared to Cat II/II. If the work takes place in good weather conditions then there shouldn't be a problem. If weather deteriorates then the work should stop and everyone + equipment clear the area for their own safety as well as aircraft safety.