It wouldn't be like ticking an option box - there would be all the NRC to cover for LM's design, testing, flight trials etc. etc. - and would the UARRSI be retained or would it be integrated into a dual-mode AAR system?
LM would rub their hands with glee at the thought of handing the bill to MoD...