Le ping. Why can't we copy the US and Canadian system where the en route controllers can also do approach work in class E low level without a separate approach rating?
In the en route airspace north of Whichita in the we small hours the en route controller of the high level airspace also does the class E approach work at non tower airports. Why can't we copy this. No extra cost as workload is low at these times