PPRuNe Forums - View Single Post - S76 C++ / D ok for SAR in EASA?
View Single Post
Old 3rd Dec 2016, 09:21
  #7 (permalink)  
Hot_LZ
 
Join Date: Sep 2009
Location: UK
Posts: 202
Received 7 Likes on 6 Posts
Dual Hoist = 2 hoists next to each other so that in the event of failure/malfunction you have the redundancy to use the second.

LZ
Hot_LZ is offline