PPRuNe Forums - View Single Post - IR ME training and time constrain
View Single Post
Old 2nd Dec 2016, 16:17
  #1 (permalink)  
slr737
 
Join Date: Mar 2002
Location: Europe
Posts: 156
Likes: 0
Received 0 Likes on 0 Posts
IR ME training and time constrain

Hello everyone,

The Belgian CAA has once again invented or discovered something.
I was wondering how it is working elsewhere.

We have students that hold a PPL and SEP and proceed in our school for a modular IR ME.
As they don't have a MEP and as per appendix 6, we do the MEP training, the IR ME training and at the end a complete MEP and IR check.

However now the belgian CAA want us to do that in 6 months as the time constraint for a class rating is 6 month. However it is difficult with people working to do a complete IR ME in 6 months.

Appendix 6 state that if the applicant of an IR ME does not hold or have hold a multi engine rating, he should before perform the training for the MEP.
Only state training and not the skill test as it is done within the IR ME test.

How is is working in your school or CAA? only modular IR ME.

thanks
slr737 is offline