Nutloose
I was talking to a guy long before the MRA 4 was cancelled who was involved with the initial work on integrating the wings on to the hand built fuselages. That issue was known at the start and the contractors came up with a plan to overcome it. Of course this plan would only work if the MOD delivered the airframes which been selected and surveyed before the CAD work had been done, which of course they didn't.