So the EEF freight will arrive by road to be shipped from LHR and vv. Not clogging up any roads with trucks, as the A4 road is to be moved and the North/South rd at the West of the airport. JHK has visited the lorry parks and cannot find an answer at this time. Oh the M25 needs to be widened for lorries using the steeper gradients of the tunnel.