The Dash7 kept us employed as they were a very maintenance intensive aircraft, especially when the RH hydraulic system devoured its own pumps. Took a few days to fix. Then the fuel tank microbe issue, the engine control cables fraying through the firewall, the main engine elec harness plug in the engine intake.
How I can never forget them! The good days of ANG in POM