PPRuNe Forums - View Single Post - why does mel ops procedure require to cross supply?
Old 18th March 2016 | 04:33
  #17 (permalink)  
aaa0808
 
Joined: Oct 2015
Posts: 17
Likes: 0
From: india
It is as explained above that the left pack provides air to the electronics bay where temperature control is crucial. So it is always prioritised whenever the conditions allow.
aaa0808 is offline  
Reply