The design of the RDF and the mechanism by which it will be administered is complete, some fine tuning, and the minister will role it out. It has actually been ready to go for some time, not sure why it has been delayed, though one could easily be conspiratorial about these things and we'll see why soon enough. Lastly, there is no new airbridge going in, near the Causeway Lounge or anywhere else in BIA and, no planning permission or building control approval has been sought and both would be required.