Originally Posted by
KiloB
So what is the plan for the T45's?
On the info available it seems that the DGs are being upgraded so that at least the lights and weapons work when they are drifting around the oggin after the GTs fail.
Say it ain't so.
KB
That's about the long and short of it.
Pre-upgrade non-WR21 generating capacity = 4MW
Post upgrade non-WR21 capacity = 9-12MW, including another generating unit. Also means the tricky stuff added to WR21 can be ditched.....