PPRuNe Forums - View Single Post - F-35 Cancelled, then what ?
View Single Post
Old 25th Jan 2016, 14:50
  #8289 (permalink)  
Mach Two
 
Join Date: May 2000
Location: UK and where I'm sent!
Posts: 519
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by Tourist
IOC does not mean front line
Even Wikipedia can do better than that.

Initial operating capability or Initial operational capability (IOC) is the state achieved when a capability is available in its minimum usefully deployable form. The term is often used in government or military procurement.

The United States Department of Defense chooses to use the term Initial Operational Capability (versus initial "operating" capability) when referring to IOC. For a U.S. Department of Defense military acquisition, IOC includes operating the training and maintaining parts of the overall system per DOTMLPF, and is defined[3] as 'In general, attained when some units and/or organizations in the force structure scheduled to receive a system have received it and have the ability to employ and maintain it.
Not front line? Or if you prefer it from the hourse's mouth, Gen Joe Dunford stated,

"I am pleased to announce that VMFA-121 has achieved initial operational capability in the F-35B, as defined by requirements outlined in the June 2014 Joint Report to Congressional Defense Committees," Dunford said in a statement. "VMFA-121 has ten aircraft in the Block 2B configuration with the requisite performance envelope and weapons clearances, to include the training, sustainment capabilities, and infrastructure to deploy to an austere site or a ship. It is capable of conducting close air support, offensive and defensive counter air, air interdiction, assault support escort and armed reconnaissance as part of a Marine Air Ground Task Force, or in support of the Joint Force."
Still not front line?
Mach Two is offline