ASR(F) Rate
When we got the briefing on the 2013 LOSA we were told that, based on observed controlled rest during the LOSA, the ASR(F) rate should be about 50/1000 sectors just for controlled rest. The total rate back then was 6.5/1000 sectors. The rate now is only about 10/1000 sectors, I'm told.