PPRuNe Forums - View Single Post - 737 NG Ground Run Max N1 before skidding.
Old 4th Nov 2015, 09:35
  #9 (permalink)  
boeing_eng
 
Join Date: Sep 2005
Location: Hyperspace
Posts: 724
Likes: 0
Received 1 Like on 1 Post
The question should be how can the maintenance staff who carried out the work certify that it had been tested prior to releasing the aircraft for service?

If the work had been carried out correctly and fully tested there would be no need for the test. If you were carrying out the test at the request of an engineer, I assume if the test was successful the engineer would then certify to that effect prior to releasing the aircraft??
boeing_eng is offline