Originally Posted by
Kulverstukas
Kolavia reps told on briefing they hold now that plane was checked in tail area for repair of structural damage condition in 2014 as part of D-Check.
And how many heavy checks did JAL 123 have in the 12,000-odd cycles before that repair let go? I wouldn't attach any great weight at all to the fact that a check was performed in 2014.