PPRuNe Forums - View Single Post - F-35 Cancelled, then what ?
View Single Post
Old 28th Oct 2015, 13:26
  #7944 (permalink)  
glad rag
 
Join Date: Aug 2007
Location: London, New York, Paris, Moscow.
Posts: 3,632
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by ORAC
And the USN orders yet more F-18Gs........

The Boeing Co., St. Louis, Missouri, is being awarded an $897,530,175 modification to a previously awarded fixed-price-incentive-firm contract (N00019-14-C-0032) for the procurement of 15 Lot 38 full-rate production EA-18G aircraft and associated airborne electronic attack kits.

Work will be performed in El Segundo, California (40.3 percent); St. Louis, Missouri (24.1 percent); Bethpage, New York (18.5 percent); Cleveland, Ohio (1.7 percent); Bloomington, Minnesota (1.5 percent); Mesa, Arizona (1.3 percent); Torrance, California (1.3 percent); Vandalia, Ohio (1.1 percent); Ajax, California (1.1 percent); Irvine, California (0.8 percent); Santa Clarita, California (0.6 percent); South Korea (0.6 percent); and various other locations in the continental U.S. (7.1 percent).

Work is expected to be completed in January 2018. Fiscal 2015 aircraft procurement (Navy) funds in the amount of $897,530,175 are being obligated at time of award, none of which will expire at the end of the current fiscal year.

The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.
Are these airframes and their system "mature"?? IE ready for operations, unlike the thread subject.
glad rag is offline