Halton operates on the basis of the VGS having priority use of the marked runways and all other traffic (powered, RAFGSA, etc) use a parallel strip with 'mirror' circuit directions, generally VGS to the north and others to the south. The RAFGSA use both winch and aerotow launching.
Last edited by chevvron; 15th Oct 2015 at 08:19.