Originally Posted by alexb757
Further news from Boeing and BA. Looks like they will repair in LAS and will take from 2-2.5 months to complete. Not sure if that includes the replacement engine or not.
Good luck with that working out!
Well, it's still sitting on the cargo ramp to where it was towed more than two weeks after the incident, and both sides of the aircraft as well as the engine pylon, have been taped off and covered in plastic sheeting.
Word has it that Boeing and BA AOG will be doing the work together. Not likely to start until some time in October since there are some logistics to sort out as well as airport authority authorizations, no doubt.