PPRuNe Forums - View Single Post - Vertically separated circuits
View Single Post
Old 15th September 2015 | 12:20
  #7 (permalink)  
ChrisJ800
10 Anniversary
 
Joined: May 2011
Posts: 367
Likes: 3
From: Philippines
When I did CPL training at Bankstown near Sydney in the 80's, circuit height was 800 feet for training touch and gos on one parallel runway and 1000 feet opposite pattern for other arrivals on the other 2 parallel runways (3 in parallel). This changed in the 90's.
ChrisJ800 is offline  
Reply