PPRuNe Forums - View Single Post - FMC coding of ‘Q’ Type approach // AINC 424 stuff
Old 20th July 2015 | 05:20
  #7 (permalink)  
vapilot2004
 
Joined: Aug 2005
Posts: 1,693
Likes: 0
From: fairly close to the colonial capitol
WC, well that all makes sense, if by RAA you mean the airline group.

The ongoing phase out of ground-based NAVAIDs has strong potential to affect marginally equipped aircraft operations when the sun is not shining. As the NEXT-GEN system begins to take shape, shutting down all but 30 airport-based VORs is both cost-saving and a forced requirement towards RNP goals.

One concern beyond protecting the 'little guys' is that of redundancy - putting all of our NAV eggs into one GPS basket doesn't seem like a good idea.
vapilot2004 is offline  
Reply