camelspyyder asked:
Did the previous MPA capability not get skipped because the contractor had supplied an unfinished PoS that was never going to work safely?
Yes. The mission system worked OK, I gather, but the airframe was an utter PoS which was a pig to fly, even after substantial modifications. Ask the TPs.....