Very interesting ... so is the entry above (crossed through in red) ... any other clues ? ... so is the entry above (crossed through in red) ... any other clues ?
The aircraft was reweighed and the new limit replaces the one lined through in red. I must have read that entry many times. I even recognise the writing. It belongs to a chap called Len who was the engineering manager for SERVO who had the contract for the maintenance.