Old Fella, in the good old days when we used tables as you describe, an error might swing things by a knot or two. That's not how it is now. There's still a cross-check as there always has been but the calculations are very error-intolerant and have to be done multiple times for various runway options and often revised at the last minute under time pressure when the load changes