PPRuNe Forums - View Single Post - EC135
Thread: EC135
View Single Post
Old 28th May 2015, 09:56
  #1074 (permalink)  
Fortyodd2
 
Join Date: Jan 2006
Location: 3nm SE of TNT, UK
Posts: 473
Received 23 Likes on 10 Posts
Jet Ranger,
The C of G datum on the 135 - in common with most ABH products is 2.16 metres in front of the leveling point, (approx where the cyclic is).
In other words, out in front of the aircraft - consequently, all data points for things fitted are "minus".
Fortyodd2 is offline