Soon after the motorway opened in 1986 traffic levels exceeded the maximum design capacity and in 1990 the Secretary of State for Transport announced plans to widen the whole of the M25 to four lanes.By 1993 the motorway, which was designed for a maximum of 88,000 vehicles per day, was carrying 200,000 vehicles per day.
Build it and they will come!