PPRuNe Forums - View Single Post - Future Carrier (Including Costs)
View Single Post
Old 19th May 2015, 01:37
  #3664 (permalink)  
Turbine D
 
Join Date: Dec 2010
Location: Middle America
Age: 84
Posts: 1,167
Likes: 0
Received 0 Likes on 0 Posts
Original post by glad rag:
Hang on though. WEBF does have one point, 35C has autoland coming, right? what about the B??
I wonder how F-35C (with the built in engine flex) auto land will handle certain interesting conditions, watch:

Part 1: http://www.youtube.com/watch_popup?v=4gGMI8d3vLs

Part 2: http://www.youtube.com/watch_popup?v=S0yj70QbBzg

Original post by ThinkTanker
LBJ is the third of the Zumwalt class (USS Lyndon B. Johnson (DDG-1002) - Wikipedia, the free encyclopedia).
It's the third and last, each of the three ships cost $3.4 billion added to more than $9 billion in development costs bringing the total to over $12 billion. The program is currently cancelled. Although the ship has stealth characteristics, it would be required to approach within 30 nm of shore to fire its guns effectively. It would be vulnerable to visual detection and no more survivable than the DDGs it would be replacing. So Lyndon has to be satisfied his name is on a limited edition ship. Another well thought out DoD program.
Turbine D is offline