PPRuNe Forums - View Single Post - Future Carrier (Including Costs)
View Single Post
Old 18th May 2015, 08:44
  #3647 (permalink)  
Davef68
 
Join Date: May 2009
Location: Here
Posts: 1,709
Received 38 Likes on 23 Posts
I susoect someone who doesn't uunderstand ship building saw the blurb on the CVF design that said it was designed for CTOL or STOVL operations and assumed that was a switchable option at minimal cost.
Davef68 is offline