The cable between Lithuania and Sweden is scheduled to be put into operation by the end of this year. The 450-kilometre underwater connection will have a capacity of 700MW.
Wouldn't be surprised if the cable turns out to be "faulty" some time down the track. Does Lithuania get a significant amount of its energy from the Soviet, oops Russia