PPRuNe Forums - View Single Post - Time based final approach spacing
View Single Post
Old 30th March 2015 | 18:39
  #43 (permalink)  
Gonzo
25 Anniversary
 
Joined: Dec 1999
Posts: 4,432
Likes: 33
From: LHR/EGLL
2nm MRS should be getting to V2 maturity in SEASR, not sure of the progress as I'm not directly involved. V2 is the feasbility stage, so effectively to develop a mature concept only.

I know that the project had identified technical and operational issues, among which, I assume, is the currency (update rate) of the surveillance picture. I assume also that the solution to this is muti-static and/or multi-lat. There's a lot of RF energy out there reflecting off aircraft.

edit: cross posted with eglnyt
Gonzo is offline  
Reply