PPRuNe Forums - View Single Post - Time based final approach spacing
View Single Post
Old 7th Feb 2015, 06:18
  #12 (permalink)  
118.70
 
Join Date: Mar 2008
Location: London
Age: 69
Posts: 148
Likes: 0
Received 0 Likes on 0 Posts
I see AIP says :

"(c) During TBS operations, RNAV (GNSS) final approach requests may be refused by Heathrow Director to ensure runway
efficiency is maintained."

Is this because RNAV doesn't have the speed flexibility to cope with TBS ?
118.70 is offline