PPRuNe Forums - View Single Post - Full power take off
View Single Post
Old 1st Feb 2015, 20:54
  #23 (permalink)  
Blink182
 
Join Date: Nov 2007
Location: Near the Mountains of Sussex
Posts: 270
Received 1 Like on 1 Post
On the 777 a Full power Take off is called after an engine change. The engine already has been test bed run and all parameters are recorded. After installation , Dry and Wet motor runs and idles are completed with checks of the Hydraulics and Electricals along with Anti-Ice. Pneumatics are checked at approx 80% N1 ( GE90) These checks are all completed by the Engineers .
The full power take off can be quite a handful when there are ATC height constraints !
First flight after engine change is naturally a ETOPS Verification flight.
Blink182 is offline