Most likely a significant factor was that MAN was the only BA domestic disrupted by snow yesterday, which made it a bit easier to make larger aircraft available to them to clear the backlog.
Insignificant point of interest this morning is that most of the European operators seem to have upgraded their MAN flights to 321s, presumably also in the interests of the backlog.