PPRuNe Forums - View Single Post - 737 weird question
View Single Post
Old 3rd Jan 2015, 16:41
  #3 (permalink)  
de facto
 
Join Date: Apr 2010
Location: Home soon
Posts: 0
Likes: 0
Received 0 Likes on 0 Posts
Skyjob The numbers refer to the slat positions to which hot air is applied.
I dont think so.
The WAI bleed vents are in such sequence for proper heating.
Each slat has a WAI bleed duct located in the middle of it,each duct has 2 spray tubes that go left and right if you will and discharge bleed air.
So i think,on the left and right side of the duct,if you look facing the slat,you will see 4 vent holes,the mmax numbers as this where the bleed "spraying" temperature is at its hottest,then as it travel along the left and right side,there will be a 2 hole vent...only 2 as to avoid the air to vent too much and cool down too early before reachinqg the end of the slat where finally it is vented out via 3 holes.

So it goes like that ,slat 1:,324423,slat 2 :324423,slat 3:324423

Last edited by de facto; 3rd Jan 2015 at 17:47. Reason: Spelllling
de facto is offline