Got to the bottom of it.
Supplement 16 for planning, then in the air the AFM figures are used, which are a lot less restrictive than the operational dispatch planning.
Applying the factor of 1.67 to the AFM figures was doubling the margin of errors built in to the AFM performance. A careful review of IR-OPS was needed and has clarified the situation.