PPRuNe Forums - View Single Post - Agusta 109C Generator / Starting Question
Old 25th October 2014 | 08:49
  #9 (permalink)  
timprice
 
Joined: Mar 2004
Posts: 273
Likes: 0
From: hayling island
Personally start one engine give it a minute, then switch generator on after opening throttle to 70% wait until load below .5 on load meter, switch off gen on first engine then start engine two, like someone mentioned above the quill shaft has a built in weakness that can shear under excessive load.
timprice is offline  
Reply