PPRuNe Forums - View Single Post - ATR 72 Drift Down procedure
View Single Post
Old 24th Oct 2014, 06:45
  #2 (permalink)  
JammedStab
 
Join Date: Apr 2008
Location: nowhere
Posts: 1
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by daywalker5
Hello everyone,

I have quite a few doubts in ATR 72-500 procedures and systems, I hope
pilots in this forum can help me.

1.Can anyone please explain the difference between Drift down ceiling and single engine gross ceiling? If they are different, during drift down procedure do we level off at drift down ceiling or single engine gross ceiling?
I believe that the one-engine inoperative ceiling is a service ceiling with a ability to still climb at a certain minimum rate while a driftdown ceiling is an absolute ceiling with zero-climb capability.

If terrain and fuel are not limiting, why not level off at an altitude below maximum which could be difficult to maintain.

Last edited by JammedStab; 24th Oct 2014 at 06:55.
JammedStab is offline