One would hope the training platform selected is on the basis of its suitability as a training platform rather than as a FAC platform, surely. Still stranger things have happened.
Back to the topic. I've heard the RFP ran to about 1000 pages and multiple proposals required. All sounds very hard for an arguably simple decision. (when compared with F-111 replacement say.)