I believe this is where Front end crew should exercise their authority to insure that it is loaded in the back. It will only take one delay at each station to off load and reshuffle the cargo to insure compliance with the NTC in future. To have a safety issue( as flimsy as this one may be) negated by ramp side staff because of the term "whenever possible" would be sad to see.