I seem to remember when Airwork got the contract at Boscombe Down, not a single Airwork controller (5?) was considered ready for validation on changeover day even though every effort was made to train them and one or two of the NATS controllers changed sides.
I can envisage the same happening at Gatwick if DFS bring in their own controllers.