I think it's not that simple. Boeing and Airbus AMMs clearly state that engine runs must be performed on a stable surface. Forget about interlocking bricks. High power runs can't even be done on asphalt. It needs to be concrete.
The aircraft engineer performing the engine runs is also accountable.