PPRuNe Forums - View Single Post - F-35 Cancelled, then what ?
View Single Post
Old 16th Jun 2014, 18:40
  #4625 (permalink)  
SpazSinbad
 
Join Date: Jul 2008
Location: Australia OZ
Age: 75
Posts: 2,581
Likes: 0
Received 52 Likes on 45 Posts
Contract for 14 F-35Bs for UK Signing at Farnborough

The F-35B Is Vertically Challenged 16 Jun 2014 Chris Pocock, AINonline
"The F-35B V/STOL version of the Lockheed Martin Joint Strike Fighter will not perform vertical landings during its international debut in the UK next month. The maneuver cannot be performed without risk of damage to runway surfaces, unless they have been constructed with high-temperature-resistant concrete....

...An official of the Royal International Air Tattoo (RIAT), where the F-35B will debut on July 11, told AIN that the concrete runway at RAF Fairford is covered with an inch-thick layer of permeable asphalt, to aid in runoff of rainfall. This layer would be at risk from the F-35B’s exhaust during a vertical landing or takeoff, he continued. The F-35B would still be able to demonstrate short landings and takeoffs, he noted.

The MoD said last week that the runways at the UK’s dwindling number of operational air bases are of asphaltic concrete construction. This type of surface could also prove susceptible to damage by the heat generated by F-35B vertical operations, it is believed....

...The UK has ordered four F-35Bs to date. A contract for 14 more has been negotiated, but the signature has been delayed until the Farnborough Air Show next month for publicity reasons. The UK is planning to acquire a total of 48 F-35s over the next 10 years. The MoD’s target of eventually buying 138 F-35s is certain to be dropped in the UK’s next defense review in 2015."
The F-35B Is Vertically Challenged | Aviation International News
SpazSinbad is offline