Ormeside28,
In my class in the Arnold Scheme (42C, starting at the beginning of September '41), at Primary School they logged time to the minute (presumably because the civilian contractor was being paid by the minute for the provision of flying training hours).
At Basic and Advanced (both wholly Army Air Corps Schools, with Air Corps officer instructors), we logged to the next five minutes.
Made the totting-up much easier !
D