PPRuNe Forums - View Single Post - Views on CASA Schedule 5
View Single Post
Old 25th May 2014 | 07:10
  #98 (permalink)  
Avgas172
 
Joined: Dec 2004
Posts: 463
Likes: 0
From: -28.1494 / 151.943
I personally couldn't care less how you sign for the work carried out provided the thorough inspection you are signing for as the second inspection required is in fact carried out ..... is it?
Avgas172 is offline  
Reply